Information Details

Project Case | Shock is coming! Entering the Geke project site

2022-03-25

Shengjian Environment takes you to the site of Geke Microelectronics' 12-inch CIS integrated circuit characteristic process production line project located in Shanghai Lingang New Area to appreciate the cutting-edge style.

Relying on the rich project experience accumulated in the pan-semiconductor field, Shengjian Environment won the bid for the engineering process exhaust system for the 12-inch CIS integrated circuit characteristic process research and development and industrialization project of Geke Semiconductor (Shanghai) Co., Ltd. in 2021 to provide it with process exhaust. System solutions (including: general exhaust system, acid-base exhaust gas treatment system and organic exhaust gas exhaust system) are used to treat complex process exhaust gases generated in the manufacturing process.

All along, Shengjian people have always adhered to the corporate values ​​of "customers first, teamwork, embracing change, passion, integrity, and excellence", devoted themselves to project construction with a high-standard and demanding work attitude, continuously improved the level of customer service, and delivered high-quality products. project.

 

1

 

 

1

 

GalaxyCore Semiconductor (Shanghai) Co., Ltd. was established in the Lingang New Area of ​​China (Shanghai) Pilot Free Trade Zone. It is a wholly-owned subsidiary of GalaxyCore Microelectronics (Hong Kong) Co., Ltd. and is affiliated with GalaxyCore Inc. The company's business scope includes the design, research and development, and testing of integrated circuits and related electronic products. Geke is committed to the design, development and sales of CMOS image sensor chips and display driver chips. It currently ranks first in the domestic market share of CMOS image sensor chip shipments and ranks second in global market share. Domestic shipments of LCD display driver chips rank second.

According to news from Shanghai Lingang Industrial Zone, Geke Semiconductor (Shanghai)'s 12-inch specialty process line project covers an area of ​​about 89,000 square meters, with a total investment of about 15.5 billion yuan. It is expected to be completed in 2024 and will build a 12-inch, monthly production capacity of 6 The 10,000-wafer chip factory has built a special process manufacturing production line for 12-inch wafer CMOS image sensor chips (including the two distinctive processes of BSI and OCF for CMOS image sensor chips). The first phase is planned to be put into production in 2022. The establishment of this production line will mark the successful transformation of Geke Micro to the Fablite model that integrates design, R&D, manufacturing and testing. As the first large-scale integrated circuit wafer manufacturing project settled in the Lingang New Area, this project has laid a solid industrial foundation for the construction of the Oriental Chip Port Characteristic Park.

(The relevant introduction comes from the official website of Geke Microelectronics and related industry reports)

- End -

 

1

Consulting

If you are interested in our products, please leave your email, we will contact you as soon as possible, thank you!

Submit Message